Unit 1 — Talawade
UNIT 1Gat No. 65, Plot No. 2, Shelar Wasti, Talawade, Pune – 411062, Maharashtra, India
Open in Google MapsInfrastructure
Manufacturing is split between Unit 1 at Talawade and Unit 2 at MIDC Chakan, with the forging facility and NDT facility supporting both.
Request a quotation →
Gat No. 65, Plot No. 2, Shelar Wasti, Talawade, Pune – 411062, Maharashtra, India
Open in Google MapsPlot No. PAP-B-65, MIDC, Chakan Industrial Area, Phase 2, Tal. Khed, Pune – 410501, Maharashtra, India
Open in Google MapsWorks visits and approval audits can be arranged. Please fix a time in advance.
Inside the works
Gat No. 65, Plot No. 2, Shelar Wasti, Talawade, Pune 411062. Unit 1 sits in the Talawade industrial area north-west of Pune, within reach of the Mumbai–Pune expressway and the Chakan belt.
Plot No. PAP-B-65, MIDC, Chakan Industrial Area, Phase 2, Tal. Khed, Pune 410501. Chakan carries the larger fabrication work, including steam headers and long pipe spools.
A plant and machinery list, with capacity figures, is issued with the technical bid for a specific enquiry. It is not published here because machine loading changes with the order book.
Request a quotation
Send the line size, pressure class, material grade and quantity. We reply within one working day.